To help out the first part, I believe it has something to do with how far it can go from the generator. Maybe someone else can clarify here.
This second part is in the reports under reigeme you need to set Block hours for work. Close reports repoen and goto programs and click start on any of the programs you have rooms for and it should show up as the pictures for Alpha 18 show. Hope this helps!
robotmp6023 wrote:Hello guys.
I am having quite a few problems with A18.
First, Crewman are not installing electrical cables correctly, If I give them a Straight Line say 50 units long, they install a roughly random set of 40, (The Electrical Cable line is not running under any walls.)
Second, When I try and Start a Kitchen Training Program, it says all Rooms Booked. I have not started any programs, and have a Classroom that is not scheduled for anything, and I have 10 Chefs when only 4 are needed for the Kitchen, so I have no idea what is causing this but it is a Problem.
Thanks
Marco
PS. I was going to send you the Saved Game File, But I don't know where it is located, if you can tell me where, I can upload it to Google Drive and send a Link, (or send it another way if someone has a better suggestion)